[1]孟国才,张晓刚,王士革,等.茂县大沟生态研究站改扩建工程用地地质灾害危险评估[J].水土保持研究,2005,12(04):208-209,211.
MENG Guo-cai,ZHANG Xiao-gang,WANG Shi-ge,et al.The Geological Hazard Assessment of Enlarging the Building for Ecological Research Station at Dagou Gully[J].Research of Soil and Water Conservation,2005,12(04):208-209,211.
点击复制
《水土保持研究》[ISSN:1005-3409/CN:61-1272/P]
卷:
12
期数:
2005年04期
页码:
208-209,211
栏目:
出版日期:
1900-01-01
- Title:
-
The Geological Hazard Assessment of Enlarging the Building for Ecological Research Station at Dagou Gully
- 作者:
-
孟国才1,2, 张晓刚1, 王士革1, 谢洪1, 张金山1,2
-
1. 中科院水利部成都山地灾害与环境研究所, 成都, 610041;
2. 中国科学院研究生院, 北京, 100039
- Author(s):
-
MENG Guo-cai1,2, ZHANG Xiao-gang1, WANG Shi-ge1, XIE Hong1, ZHANG Jin-shan1,2
-
1. Institute of Mountain Hazard and Environment, Chinese Academy of Sciences & Ministry of Water Conservancy, Chengdu 610041, China;
2. Graduate School, Chinese Academy of Sciences, Beijing 100039, China
-
- 关键词:
-
茂县大沟; 生态站; 地质灾害; 工程地质条件; 防治措施
- Keywords:
-
Dagou gully of Mao county; ecological station; geological disaster; engineering geology condition; preventives
- 分类号:
-
P694
- 摘要:
-
位于岷江上游一级支流-大沟沟谷中的中科院成都生物研究所茂县生态站,为了适应新的需要,在原有规模之上进行改扩建工程,其前提是必须要对工程所在场地进行地质评估。通过对场地地质条件的实地考察,明确其所在流域地质环境特征,并在典型部位进行简易槽探,同时对采集的样品进行了室内物理力学试验分析,最终做出全面的地质评估,并提出相关结论与建议。
- Abstract:
-
The Mao County Ecology Research Station of Chendu Biological Institute lies in the Dagou gully, which is the first-degree branch of the Minjing River.In order to meet the development of research station’s need, the research station has to enlarge intrinsic building’s scale, so the geological evaluation is important.Throughout the field survey on the study station, the environment characteristic and the simple notch exploration on specimen collection was made.At the same time, a physical mechanical experimentation on specimen collection was carried out.At last, an all-around geological evaluation was made and correlative conclusion and advice were given.
更新日期/Last Update:
1900-01-01