[1]LIU Huimin,ZHU Jianghong.Study on Time Sequence and Mode of High-Standard Prime Farmland Construction in the Hilly and Mountainous Area[J].Research of Soil and Water Conservation,2015,22(02):141-146.
Copy
Research of Soil and Water Conservation[ISSN 1005-3409/CN 61-1272/P] Volume:
22
Number of periods:
2015 02
Page number:
141-146
Column:
Public date:
2015-04-28
- Title:
-
Study on Time Sequence and Mode of High-Standard Prime Farmland Construction in the Hilly and Mountainous Area
- Author(s):
-
LIU Huimin, ZHU Jianghong
-
School of Public Administration, China University of Geosciences(Wuhan), Wuhan 430074, China
-
- Keywords:
-
high-standard prime farmland; time sequence; mode; analytic hierarchy process (AHP); positive ideal point
- CLC:
-
F301.21
- DOI:
-
-
- Abstract:
-
A reasonable schedule and scientific mode of high-standard prime farmland construction are of great significance. Taking Yun County as study area, this article used analytic hierarchy process(AHP) and ‘Positive ideal point’ to determine the time sequence of high-standard prime farmland construction. Three kinds of modes of high-standard prime farmland construction were put forward by analyzing the quality and location condition of cultivated land, the social and economic conditions. The results showed that high-standard prime farmland in Yun County could be divided into near-, mid-and long-term construction areas, and their area proportions of near, mid and long-term construction areas were 12.88%, 37.76% and 49.36%, respectively. According to the levels of the limiting factors of high-standard prime farmland construction in the evaluation units, the modes of high-standard prime farmland construction of Yun County were divided into three types including the mode of improving quality of arable land, optimizing location condition, social advocacy. The research results can effectively guide the construction of high-standard prime farmland.