[1]MU Tian-liang,WNAG Quan-jiu.Study on the Determination Method of the Optimized Dam Height[J].Research of Soil and Water Conservation,2008,15(04):24-27.
Copy

Study on the Determination Method of the Optimized Dam Height

References:
[1] 《水土保持治沟骨干工程暂行技术规范》(SD175-86)[S].
[2] 《淤地坝工程技术规范》(晋Q834-85)[S].
[3] 《水利经济计算规范》(SD139-85)[S].
[4] 郭文元, 穆天亮.关于淤地坝设计洪水标准确定方法的探讨[J].山西水土保持科技, 1986(4):15-18.
[5] 穆天亮, 郭文元.淤地坝枢纽结构的选择和溢洪道最佳宽度的确定[J].水土保持学报, 1990, 4(2):19-25.
[6] 聂兴山, 许国平, 郭文元. 晋西王家沟流域坝地发展灰色预测[C]//晋西淤地坝试验研究文集, 郑州:黄河水利出版社, 2000:180-185.
[7] 郭文元, 李如鸿.淤地坝工程有关问题探讨[J].山西水土保持科技, 1985(3):12-18.
Similar References:

Memo

-

Last Update: 1900-01-01

Online:10824       Total Traffic Statistics:27435233

Website Copyright: Research of Soil and Water Conservation Shaanxi ICP No.11014090-10
Tel: 029-87012705 Address: Editorial Department of Research of Soil and Water Conservation, No. 26, Xinong Road, Yangling, Shaanxi Postcode: 712100