[1]SHI Yu-chuan,JI Feng,FENG Wen-kai.Application of BP Neural Network in the Tunnel Rock Blasting[J].Research of Soil and Water Conservation,2007,14(05):242-244.
Copy
Research of Soil and Water Conservation[ISSN 1005-3409/CN 61-1272/P] Volume:
14
Number of periods:
2007年05期
Page number:
242-244
Column:
Public date:
1900-01-01
- Title:
-
Application of BP Neural Network in the Tunnel Rock Blasting
- Author(s):
-
SHI Yu-chuan, JI Feng, FENG Wen-kai
-
Environment and Civil Engineering Institute, Chengdu University of Technology, Chengdu 610059, China
-
- Keywords:
-
BP neural network; tunnel; rock burst
- CLC:
-
TP813
- DOI:
-
-
- Abstract:
-
Four diversion tunnels and two parallel traffic tunnels to be constructed in a hydropower of Southwest,but the buried deep in the project area is 1 000~2 000 m in general,the largest is 2 525 m,which located in the high stress zone,now excavation hole of the 2 000 m are found in the low to medium rock burst phenomenon,therefore,rock burst intensity of the tunnel is very sensitive in subsequent excavation in the deep,long and big conditions,using BP artificial neural network established a burst prediction models which includes strength brittleness factor,stress factors such as elements of the eight indicators,achieved 12 200 m support for the forthcoming excavation hole of a forecast.The results showed that the effect of this forecasting methods is good,and coincide with the geological analysis judgement,which can be used for further guidance practice.