[1]CHANG Wen-zhe,XU Xiao-mei,LIU Hai-yan.Discussions on the Construction Scale and Overall Arrangement of Chengxichuan Dams[J].Research of Soil and Water Conservation,2006,13(01):204-205.
Copy
Research of Soil and Water Conservation[ISSN 1005-3409/CN 61-1272/P] Volume:
13
Number of periods:
2006年01期
Page number:
204-205
Column:
Public date:
1900-01-01
- Title:
-
Discussions on the Construction Scale and Overall Arrangement of Chengxichuan Dams
- Author(s):
-
CHANG Wen-zhe, XU Xiao-mei, LIU Hai-yan
-
Xifeng Soil and Water Conservation Experimental Station, Water Conservancy Committee of the Yellow River, Qingyang, Gansu 745000, China
-
- Keywords:
-
silt trap dam; dams’construction scale; overall arrangement; Chengxichuan river basin
- CLC:
-
S157.31
- DOI:
-
-
- Abstract:
-
Through systematic analyses of the social and natural conditions,current soil erosion situation,dams construction potential,sediment reducing goal,silting land goal,the construction goal of Chengxichuan basin dams system is to build 14 key dams,8 medium and 48 small-scale silt trap dams,the proportion is 1:4.According to this goal,the authors give the positioning principle,thinking and scheme.