[1]ZENG Sen-huang,LU Zhao-yao,WU Yi-yu.Post-earthquake Reconstruction of Channel Upstream of Drought River[J].Research of Soil and Water Conservation,2001,8(04):106-113.
Copy
Research of Soil and Water Conservation[ISSN 1005-3409/CN 61-1272/P] Volume:
8
Number of periods:
2001年04期
Page number:
106-113
Column:
Public date:
1900-01-01
- Title:
-
Post-earthquake Reconstruction of Channel Upstream of Drought River
- Author(s):
-
ZENG Sen-huang1, LU Zhao-yao2, WU Yi-yu1
-
1. Department of Civil Engineering, Chien Kuo Institute of Technology, Chunghua 500, Taiwan, China;
2. Department of Civil Engineering, Chung Hsing University, Taichung 402, Taiwan, China
-
- Keywords:
-
post-earthquake reconstruction; landslide; soil and water conservation; water surface profile
- CLC:
-
P315.9
- DOI:
-
-
- Abstract:
-
A large crack occurred at the top of the hillslope, and several landslides occurred along the Drought River (a tributary of Dali River) between Guan-In Bridge and Nan-Yang Bridge as a result of Chi Chi earthquake on September 2, 1999. The landslide material blocked part of the channel waterway, and the bare surface increased the instability of the hillslope. Drought River, which is a tributary of Da-Li River, is a principal river in Taiwan. Therefore, it is required to use one hundred-year flood in the design of post-earthquake reconstruction. The cross-sectional shape was designed based on the existing geographical condition and the calculation of gradually varied flow to ensure a proper freeboard and the passage of design flood. In addition, the stability and the vegetation were also considered in the project to conserve the stability and the natural landscape of the hillslope.